Skip to content

See live output, speed, and stop reasons on every line in your hall.

Plug a compact sealed module inline at an existing sensor on your machine in 15 minutes — with no rewiring and no changes to your machine software. Follow real-time output, running speed, and downtime reasons in Microsoft Power BI and on shop-floor screens.

Microsoft Power BI Overall Equipment Effectiveness and pieces-per-minute speed report for VeraPack Group
VeraPack Group · Microsoft Power BI482.4K pcs · 82% OEE

Three synchronized screens across leadership, floor TVs, and machine stations.

Test the interactive Power BI line view, the live shop-floor scoreboard, and the one-tap operator stop reason screen using anonymized VeraPack Group figures.

Sample plant — VeraPack Group

Microsoft Power BI — Daily Production & OEE

Steady at 314 / 320 pcs/min — brief 90s carton refill at 09:40

LN-10106:00 – 14:00

Bottling & Capping Line 1

3 sensors (Filler, Capper, Case Packer)
90.2%
Overall Equipment Effectiveness
Availability93%
Performance (Speed)98%
Quality99%
Total pcs produced114,200
Shift length8.00 hrs
Quality accepted113,220
Quality rejected980
Operating hours7.44 hrs
Idle time0.56 hrs
Pieces-per-Minute Speed Graph (06:00 – 14:00)Target: 320 pcs/min
Emerald: Target · Amber: Below target · Rose: Stopped314 / 320 pcs/min

Plug in right at the sensor on the machine — live in 15 minutes.

Each compact sealed module plugs directly inline at an existing sensor on your machine and sends counts over Wi-Fi, with zero rewiring and zero changes to machine software.

Compact sealed APC inline sensor module with ruggedized connectors
Sealed exterior housing built to mount right at the sensor on the machine.

1 sensor per line — Output & speed

Tracks piece counts, running hours, stop durations, and live pieces-per-minute curves on any machine regardless of age.

2 sensors per line — Good parts vs. scrap

Compares total machine cycles against good parts leaving the line so rejected pieces appear in Power BI automatically.

3+ sensors per line — Stage-by-stage bottleneck

Monitors separate stages such as filler, capper, and packer to pinpoint exactly which machine is holding up output.

Offline memory & on-site spare modules

Each module stores counts locally if Wi-Fi drops, and spare modules stay on your shelf at the plant for a 2-minute swap.

High-speed stainless steel bottling line with compact inline counting sensors mounted along the conveyor railClean European packaging conveyor line illuminated by natural factory skylights

See where production time goes during every shift.

Daily totals tell you how much was produced, not why 88 minutes disappeared along the shift. Inspect four common shop-floor losses below.

06:00 – 08:00 — Delayed shift start

24 minutes lost

Production begins at 06:24 instead of 06:00 while sealing heaters warm up after handover.

10-minute intervalsEmerald: Target · Amber: Below target · Rose: Stopped
Typical action takenPut heaters on an automatic pre-start timer 20 minutes before the shift begins.
Comparison between flat end-of-shift summary and live minute-by-minute shift visibilityIndustrial touchscreen displaying live production curve beside a manufacturing machine

Straightforward monthly pricing per sensor.

Sensor modules and on-site spare modules are included in the monthly subscription with no upfront equipment purchase.

20 sensors (Full-Plant Rollout)
4–15 (€89)16–70 (€75)71–100 (€55)101–250 (€45)251+ (€39)
20 × €75/sensor + €250 live Power BI data connection
€1,750 / month
Includes sensor modules & 4 on-site spare modules
4 – 15 sensors

30-Day Pilot

€89 / sensor / mo
Example: 8 sensors = €712 / month

Start on two to four lines to evaluate live output, speed curves, and stop reasons in your own hall.

  • Sensor modules included with no upfront purchase
  • 2 on-site spare modules included
  • Microsoft Power BI reports & shop-floor screens
  • Continue, expand, or return after 30 days
Start a 30-Day Pilot
71+ sensors

High Volume & Multi-Plant

€55 – €39 / sensor / mo
€55 (71–100, +€250) · €45 (101–250) · €39 (251+)

Volume rates for large manufacturing halls or standardized rollouts across multiple plants.

  • Cross-plant Power BI benchmarking
  • Live Power BI data connection included above 100 sensors
  • 6 to 15+ spare modules across sites
  • Standard Data Processing Agreement
Request a Volume Quote

Want to compare the monthly subscription against recovered running hours on your lines?

Open Savings Calculator →

Start with a 30-day pilot on your own lines.

Test APC DataLab with 4 to 15 sensors in your production hall. After 30 days, continue month-to-month, expand across more lines, or return the modules with no further commitment.

  • 4 to 15 compact sealed modules shipped ready to plug in
  • 2 on-site spare modules kept at your plant during the pilot
  • Ready-made Microsoft Power BI reports & shop-floor screens
  • Continue, expand, or return the modules after 30 days

Questions first? Write directly to apc.app@apcdatalab.app

Request a 30-Day Pilot

Number of sensors€712 / month

Used only by APC Innovations to respond to your inquiry. Privacy Policy